CORRECTION: Sodium Chloride was applied (late april) as a TRIAL to 610th Ave (from train tracks to intersection) and partially onto 211th st. to help stabilize the road. THIS WAS A TRIAL ONLY.
CORRECTION: Sodium Chloride was applied (late april) as a TRIAL to 610th Ave (from train tracks to intersection) and partially onto 211th st. to help stabilize the road. THIS WAS A TRIAL ONLY.